BETTER WE CAN TOGETHER

Hybrid Electricity

GCI has already installed a set of Wind and Solar energy at Ramkot farmhouse which is generating nearly 3 Kilowatt of energy. The set was installed for examination purpose after doing research for nearly one year in consultation with professors of Center for Engineering Studies of Tribhuwan University.

GCI is also planning to install Japanese made wind and solar energy sets where the electricity can be generated even in the low speed of wind in all possible regions of Nepal. In addition, GCI is planning to replicate magnetic electricity production in Nepal which has been successfully implemented in Japan.

In this regard, scientist from Japan specializing in this area have recently visited Nepal, and had meetings with Rt.Honorable President, Prime Minister, Chair Person of CS and Minister of Industry.